2015.11.20
Shipment of KON-12000 (300)/26000 (120) air separation unit
Recently, KON-12000 (300) /26000(120) type air separation equipment was successfully shipped to Russia, of which large equipment was shipped in bare packaging, small equipment was packaged in wooden cases and shipped in containers.
2015.11.20
Shipment of KDONAr-3500/2000/100Y air separation unit
Recently, KDONAr-3500/2000/100Y type air separation equipment was successfully shipped from Shanghai port to Turkey, of which large equipment was shipped in bare packaging, small equipment was packaged in wooden cases and shipped in containers.
2015.10.18
At present, the renovation project of 300,000 standard square meters/day liquefied natural gas plant in Yulin has successfully produced -160℃ low-temperature LNG products.
2015.09.08
In August 2015, the 200,000 sq. / day ammonia escape gas cryogenic separation and LNG production unit successfully started a one-time operation and produced qualified LNG products.
2015.08.26
The 50,000 cubic meters per day skid-mounted LNG facility in Xiangyuan, Shanxi, has begun operation.
On August 26, 2015, the 50,000-square-per-day skid-mounted LNG plant in Xiangyuan, Shanxi Province was successfully started and produced LNG products.
2015.08.23
Hebei’s 700,000-ton-per-year clean energy (LNG) project breaks ground and lays its foundation.
Hebei Clean energy (LNG) project with an annual output of 700,000 tons held a groundbreaking ceremony in Zaoqiang Industrial Park on August 16, 2015, marking the official launch of the project.
Follow us